BW Flexible Systems
Unique Challenges
- Design build electrical system for 85,000 sq. ft. custom packaging equipment design and assembly facility
- Overcame supply chain issue by redesigning the distribution system to use shorter lead time equipment
- Assisted client by identifying power requirements for the existing equipment being relocated
- Compressed construction schedule
Project Features
- 12,000 sq. ft. of corporate office space
- Suspended wireway, busduct and cable tray system to simplify future system modifications in production area
- Multiple bridge cranes and jib cranes
- Standardized high amperage outlets that the client uses for equipment testing
